Hi everybody,
I would like to know if it is possible to run a batch job from one time to another (I mean from 08.00 am to 07.00 pm)?
Thanks a loto for help.
Massimiliano
Batch job time interval
- Posts: 2
- Joined: 16 Jan 2024
- Posts: 3614
- Joined: 11 Jun 2019
Task Scheduler
- Posts: 2
- Joined: 16 Jan 2024
Thanks!
- Attachments
-
- Schermata 2024-01-16 alle 18.21.39.png (299.61 KiB) Viewed 608 times
-
- Schermata 2024-01-16 alle 18.22.02.png (135.18 KiB) Viewed 608 times