Hi everybody,
I would like to know if it is possible to run a batch job from one time to another (I mean from 08.00 am to 07.00 pm)?
Thanks a loto for help.
Massimiliano
Batch job time interval
- Posts: 2
- Joined: 16 Jan 2024
- Posts: 4946
- Joined: 11 Jun 2019
Task Scheduler
- Posts: 2
- Joined: 16 Jan 2024
Thanks!
You do not have the required permissions to view the files attached to this post.